Switch on
Use approved connecting cables onlyThe power supply box is positioned at the right bottom side of the folder. Please use the connecting cable that comes with the folder or cables of the same safety standard only. |
|
The main switch is at the folder´s right front side.
The display shows software version and validation date for a few seconds. The folding program which has been used before the folder was switched off will be called up. A message appears in the display as soon as an error is detected during the self-test routine e.g.: "light barrier cut 01". Make sure that there is no paper on the feed table or inside the folder. Remove the paper and confirm by button ? in case one of the light barriers was blocked by paper. |